Same unit, a different price

A unit of electricity bought a day ahead on the Indian Energy Exchange (IEX) cost ₹2.67 on average in October 2025. In October 2026, it cost ₹6.66. That is up 149% in a year, about two and a half times the price. The exchange's update points to El Niño, a weak monsoon and a low base a year earlier.

Same voltage. Same wires. Same unit on the meter. Only the price changed.

The unit did not change. The price did.

Price can also be charged for power that has not flowed yet. In July 2026, the auction that pays power plants to be available in 2028 and 2029 on the PJM grid, which serves more than 67 million people in 13 US states and the District of Columbia, cleared at its ceiling of $325 per megawatt per day. It still fell 6,831 megawatts short of what the grid needs for reliability, with data centre demand in the forecast.

Chapter 1 was about getting power. This chapter is about paying for it.

The mandi and the contract farmer

Think about how a busy restaurant buys tomatoes.

It can pay the mandi price every morning. Some weeks tomatoes are cheap; some weeks they triple. It can pay more for a delivery at the evening rush. Or it can sign a fixed price per kilo with a farmer for three years, whatever the mandi does.

Electricity is bought the same ways, and the Tokenomics Stack lists them under Price and Procurement.

The mandi, the rush-hour delivery and the contract farmer.
  • Tariffs and time-of-day pricing. The rate card from your electricity company, which increasingly changes by hour. India's Electricity (Rights of Consumers) Amendment Rules, 2023 require time-of-day tariffs for commercial and industrial users with demand above 10 kilowatts (kW) from 1 April 2024. During peak hours, they pay at least 1.2 times the normal energy charge. During the solar hours set by each state commission, the rate must be at least 20% below normal.
  • Power purchase agreements (PPAs). The contract farmer. A long-term deal, often ten to twenty years, to buy power from a specific plant at agreed terms. In June 2025, Meta signed a 20-year agreement with Constellation for 1,121 megawatts (MW) from the Clinton nuclear plant in Illinois, starting June 2027. "Securing clean, reliable energy is necessary to continue advancing our AI ambitions," said Urvi Parekh, head of global energy at Meta.
  • Price gaps between regions. The mandi in one city is not the mandi in the next. In 2024, according to the US Energy Information Administration (EIA), industrial users paid an average of 6.12 US cents a unit in Texas, 8.99 cents in Virginia and 21.53 cents in California. California's industrial power cost about three and a half times what Texas's did.
Same unit, three states, three prices.

In our kitchen, Layer 0 is the gas, power and water bill. This component decides whether that bill is a rate card, a contract or a daily market, and how much of it you can predict.

Price lever, and a risk lever

This component is a pure price lever. It does not change how many tokens your business spends. It changes what each one costs at the very bottom of the stack, and that cost flows upward through every layer above it. The framework is blunt: the lower three layers "set what a token costs, in dollars and in watts."

But price is only half of it. The other half is volatility. A business that pays ₹2.67 one October and ₹6.66 the next has two problems: a higher bill, and a budget it could not plan. Long-term contracts exist mainly to solve the second.

The capacity auction shows a third cost most people never see: $325 per megawatt per day paid for the promise that power will be there at peak, before a single unit flows. My own rough arithmetic: a 100-megawatt data centre exposed to that full price would carry about $32,500 a day, roughly $12 million a year. PJM notes that hedged buyers are not fully exposed. But somebody pays.

A bill for a promise, paid before a single unit flows.

Even long-term contracts are moving. LevelTen Energy, which runs a marketplace for these agreements, reported on 20 October 2026 that its benchmark for lower-priced North American solar contracts rose 4.9% in the third quarter, mainly on new import tariffs for solar panels. Its core-markets benchmarks sit at $64.23 per megawatt-hour (MWh, a thousand units) for solar and $68.27 for wind. The biggest buyers, it says, are mostly chasing data centre power targets.

The framework names the decisions this component holds:

  • Where: site capacity "where delivered power is available and priced well."
  • When: shift work that can wait to "the hours when power is cheaper or cleaner."
  • How you buy: "contract supply," which in practice means choosing the mix of fixed contracts, rate-card tariffs and market purchases.

And a warning for most readers: "Each step away from owning the facility hands more of the energy decision to someone else." If you rent AI from a cloud provider, you are not buying power. You are buying tokens with power already priced in, at a margin you cannot see.

What I would do on Monday morning

  1. Find out how power reaches your bill. If you host your own servers, ask whether electricity is passed through at metered cost or bundled into the rack price, and on which tariff. If you buy from a cloud or AI provider, ask which regions run your work and whether prices differ by region.
  2. Move "can wait" work into cheap hours. In India, solar-hour tariffs for commercial and industrial users must be at least 20% below normal. Many AI providers also sell cheaper bulk processing, where requests are queued and answered within hours rather than seconds. Tag every overnight report, bulk document job and model test, and buy it in the cheap window.
  3. Buy power like a procurement head, not a gambler. No sensible buyer puts all of a critical raw material on a 20-year fixed contract, or all of it on the daily market. If you can contract power directly, layer a long-term agreement under a share bought on the exchange. If you cannot, ask your provider how they hedge, because their hedge is your price stability.

Next

You have bought the power. Now, how much of it reaches the chips? In Chapter 3, we look at Facility Efficiency: the power lost to cooling and other overheads before a single token is made, and what happens to all that waste heat.


This series builds on The Seven-Layer Tokenomics Stack by the Tokenomics Foundation, used under a Creative Commons Attribution 4.0 licence (CC BY 4.0). The commentary, and any mistakes, are mine. Views are my own and do not represent my employer.

Sources

Every figure was checked against its source on 5 November 2026.

  1. Tokenomics Foundation, The Seven-Layer Tokenomics Stack (full paper), October 2026, Creative Commons Attribution 4.0 licence (CC BY 4.0). Price and Procurement component (tariffs and time-of-use pricing, power purchase agreements, regional price differentials); siting, time-shifting and contracting decisions; "set what a token costs" and "each step away from owning the facility" quotes.
  2. Business Standard, Spot power prices jump 149% to ₹6.66 per unit in October on demand surge, 3 November 2026, reporting the Indian Energy Exchange (IEX) monthly update. Day-ahead average ₹6.66 per unit in October 2026 against ₹2.67 in October 2025 (up 149%); El Niño, weak monsoon and low-base explanations.
  3. Power Peak Digest, IEX electricity trading volume rises 16.5% to 13,092 MU in October, 5 November 2026. Second confirmation of the ₹6.66 and ₹2.67 figures.
  4. PJM Interconnection, PJM Capacity Auction Procures 138,318 MW of Generation Resources (press release), 14 July 2026 (also on Inside Lines). 2028/2029 auction cleared at the $325 per megawatt-day cap; 6,831 megawatts short of the reliability requirement; more than 67 million people in 13 states and the District of Columbia; data centre loads in the forecast; hedged load not exposed to clearing prices.
  5. Press Information Bureau, Ministry of Power, Time of Day tariff (Rajya Sabha reply), 2 August 2023, on the Electricity (Rights of Consumers) Amendment Rules, 2023. Commercial and industrial users above 10 kilowatts (kW) from 1 April 2024; peak at least 1.20 times normal; solar hours at least 20% below normal.
  6. Constellation Energy, Constellation, Meta sign 20-year deal for clean, reliable nuclear energy in Illinois, 3 June 2025. 20-year agreement, 1,121 megawatts (MW), Clinton Clean Energy Center, from June 2027; Urvi Parekh quote.
  7. US Energy Information Administration (EIA), 2024 Average Retail Price by State and Sector (Table 4), 2024 data. Industrial average 6.12 cents per kilowatt-hour in Texas, 8.99 in Virginia, 21.53 in California.
  8. LevelTen Energy, LevelTen North American PPA Price Index, Q3 2026, 20 October 2026. Lower-priced solar benchmark up 4.9% in the quarter, mainly on new import tariffs; core-markets benchmarks of $64.23 (solar) and $68.27 (wind) per megawatt-hour (MWh); largest buyers mostly pursuing data centre power targets.